+372 5649 5010
Kileprof

Hotel elevator renovation

The hotel's worn surfaces were quickly and cleanly updated with elevator wrapping, giving the elevators a fresh, modern look without a major renovation.

The goal of renovating the hotel elevators was to improve the overall impression and extend the life of existing surfaces without replacing the elevators. Elevators are some of the most used surfaces in a building, and over time, signs of wear, scratches, and visual fatigue appear. Wrapping is a practical solution in such situations, allowing for a visually clean and renewed result in a short amount of time.

During the work, the interior and exterior surfaces of the elevators were covered with high-quality architectural vinyl films that mimic a uniform and correct finish and blend with the hotel's overall interior. Before installation, the surfaces were prepared, dirt and signs of wear were removed, and then the film was precisely fitted to the details and edges. The film application allowed the elevators to remain in use, avoiding extended downtime, which is particularly important in a hotel environment.

As a result, the elevators gained a modern and well-maintained appearance, which improves the first impression of visitors and helps maintain a cohesive interior style. This renovation method is cost-effective, durable, and adaptable for future changes if needed.

Work performed
  • decorative sealing
  • surface preparation and cleaning
  • Preparation of lifting surfaces
  • covering worn surfaces with vinyl film
Project details
Material
3M Di-Noc
Client
Bankend Group OÜ
Category
Decorative films
Request a quote

Project photos

Work process

Kileprof — Hotel Elevator Renovation
Kileprof — Hotel Elevator Renovation
Kileprof — Hotel Elevator Renovation
Kileprof — Hotel Elevator Renovation
Kileprof — Hotel Elevator Renovation